|
About Our Buildings:
- Constructed on 200mm, 250 mm or 310mm steel Universal Beams
- Pretreated and spray painted in Rust Guard Epoxy Enamel
- Welded Steel frame walls and roof structrure
- Engineered cyclone bracing built into steel framing up to C3 wind rating
- Colorbond Steel Cladding for roof and walls
( click on the Colorbond link to view the wide available range at Colorbond)
- Interior walls cladded with paper/polyester overlay plywood
( click on the Gunnersens link to view the available range at Gunnersens)
- Standard flooring 20mm H3 treated Plywood Flooring
- Bathroom and Laundry flooring, 20mm water proof cement sheeting
- Split system air conditioning, reverse clycle and Inverter systems
- Engineer footings plans available for council application
- Certification of building for Council application available
- Assistance in on-site needs for building delivery
- Organise footings, patio slabs and additional roofing needs
- Transport costs kept down by using Stick Lizard Transport with buildings to fit tilt tray trucks, without with need of escorts, cranes or forklifts
|
Windspray |
All buildings can be fitted with bathrooms, kitchens, cupboards, benches, sinks, exterior awnings, security grills and furnishings to meet your individual requirements! |